隧道施工Tunnelconstruction任务五地表下沉.pptx
隧道施工
Tunnelconstruction;2;3;地表沉降量测概念
Conceptofsurfacesettlementmeasurement;浅埋隧道通常位于软弱、破碎、自稳时间极短的围岩中,施工方法不妥极易发生冒顶塌方或地表有害下沉,当地表有建筑物时会危及其安全。地表下沉量测实际上就是量测地面高程,多次测量求出的差值就是地表下沉值。
Shallowburiedtunnelsareusuallylocatedinweak,brokensurroundingrockswithveryshortselfstabilizationtime.Improperconstructionmethodsareverypronetoroofcollapseorharmfulsurfacesubsidence.Whentherearebuildingsonthesurface,theirsafetywillbeendangered.Surfacesubsidencemeasurementisactuallymeasuringthegroundelevation,andthedifferenceobtainedfrommultiplemeasurementsisthesurfacesubsidencevalue.;测量实施—(一)测点设置
Measurementimplementation-(I)measurementpointsetting;测量实施—(二)测点布置
Surveyimplementation-(II)layoutofsurveypoints;地表沉降测点纵向间距
Longitudinalspacingofsurfacesettlementmeasuringpoints;地表沉降测点横向间距为2—5m。在隧道中线附近测点应适当加密,隧道中线两侧量测范围不应小于H0+B,地表有控制性建(构)筑物时.量测范围应活当加宽。
Thehorizontalspacingofsurfacesettlementmeasuringpointsis2-5M.Themeasuringpointsnearthetunnelcenterlineshallbeproperlydensified,andthemeasuringrangeonbothsidesofthetunnelcenterlineshallnotbelessthanH0+B.whentherearecontrolledbuildings(structures)onthesurface,themeasuringrangeshallbewidened.;;量测断面距开挖面距离(m)
Distancebetweenmeasuredsectionandexcavationface(m);数据记录
Datarecord;;数据分析
Dataanalysis;;;敬业精神
Professionalism