文档详情

TUV莱茵审核不符合项目整改措施(般不符合).doc

发布:2017-04-03约2.69千字共4页下载文档
文本预览下载声明
i accreditation approvedBy TUV Auditors; Freelancers disclosed F-NCR-UV-G-ALL docIndex 7 docType Form docTypelong Karin Strehle issuedBy German language 01.02.2008 MFvalidFrom 01.01.2099 MFvalidUntil Global region No regSuppl releaseDate revision standard stateofValidity 4.3.1; 4.3.2; 4.3.3; 4.3.4; 4.3.5; 4.3.6; 4.3.7 workflPos Nonconformity Report (list of nonconformities) title 0.0 Managementsystem Representative: 胡庆全先生 Audit Team Leader: 陈永忠女士 Auditor(s)/Expert: 王近水先生,王莉女士 Audit Date: 2013—7-25~26 Date Audit Team Leader Managementsystem Representative The client is required to analyse the root cause of the nonconformities. This results and the correction(s) and corrective action(s) has (have) to be described in the nonconformity report and has (have) to be forwarded to the audit team leader rapidly. Documents, which prove the elimination of the nonconformities have to be submitted Correction(s) and corrective action(s) are appropriate. Correction(s) has (have) been verified, including documents submitted later. A re-audit was performed. Date, processing auditor No Ref Nonconformity [Discussed with whom and where?] proof Cause analysis [by whom?] Corrections and Corrective Action [by whom?] Completion date 01 ISO9001 7.5.2 技术研发部 裴先生 查深冷处理特殊工序的再确认:不能提供。 D 1.设备组对点检的内容和要求不够细致。 重新制定点检表格,细化点检的内容和要求, 将点检的内容标准明示在设备现场。 对设备相关责任人进行点检要求的培训,重点讲述设备安全防护及安全操作的流程。 8月25日 02 OHSAS18001 4.4.6 生产部/设备组 杜先生 抽查编号004-001卧式加工中心和016-001卧式车床,在2013年搬迁并重新安装调试后,未提供对其防护和保护装置的有效性、警示标识的符合性等进行验收的证据。 D 03 ISO9001 7.5.1 技术研发部(工艺)张茂权 补焊工序管控存在以下欠缺: 下发现场的《铸钢件补焊作业指导书》中要求“焊补后的铸钢件其尺寸偏差和加工余量除符合图样以外,还应符合GB/T7927的规定”,而GB/T7927是手扶拖拉机 振动测量方法; 上述作业指导书要求“铸件补焊前,对一般缺陷的焊补应用磁粉,渗透探伤进行检验,对重要焊补…,确认缺陷清楚后,方可施焊”,抽查在2013年7月3日对订单号SDS13001KC的Q747F-16/DN300阀门的补焊记录,没有证据表明上述要求被执行; 上述作业指导书要求“水压试验中发现的缺陷而进行补焊的,需进行热处理”,抽查2013年7月至今的补焊记录,没有证据表明热处理要求被执行。 04 OHSAS18001 4.4.6 企管办 何先生 食品储存间内发现消毒剂、杀虫剂、金属工具与食品混放。 熟菜无
显示全部
相似文档