厂区生活水管道与事故排油管道作业指导书.doc
文本预览下载声明
ILFS Cuddalore
2×600MW Thermal Power Project
Client: ILFS Tamil Nadu Power Company Limited . Consultant: FICHTNER Consulting Engineers (INDIA) PVT. LTD Contractor:
Shandong TIEJUN Electric Power Engineering Company Limited Sub-Contractor: Jaishakti engg. construction. Work procedure for portable water and oil supply pipe line. No:- Total Page:21
Work Procedure
compiled date month year
verified date month year
approved date month year
CONTENTS
Reference and standards
Scope of work Introduction
Shifting of Equipment
Manpower
Tools Measuring Instrument
Mechanical (PM)
Work schedule
Process flow chart for underground pipe line
Piping pre – fabrication
Trench excavation
Piping Erection Procedure
Procedure for boxing up of interface joints
Quality requirement
Hydro test of pipes
Painting for above ground pipes
Wrapping and coating for underground pipes
Primer ,wrapping and coating application for field join of pipes after laying at site
Back filling of trench
HSE management
Safety construction risk control scheme
Work precaution in Rainy season
1. Reference and Standards:-
Project portable water pipe and oil pipe line Drawings by Shandong Tiejun.
Quality indicators and acceptance criteria (FQP, WPS, work procedure etc.)
Contracts Documents
2. Scope of work Introduction:-
2.1) Scope:
The scope of work comprises executing works pertaining to portable and water pipe line which includes assembly and erection of pipes. The following activities are involved in erection, transporting of materials, unloading at working area, cleaning, lifting and positioning, welding, leveling, painting , wrapping and coating and erection of pipes and other accessories etc.